国产精品一二三四区免费,久久久噜噜噜888久久,国产真实乱子伦精品视频,中文字幕乱码亚州无线码二区

Stock code:871165
Mobile phone +8613829250070 中文
Online Message Common problem

Industry information

Your current position: Home > News> Industry information

Configuration characteristics of central feeding system process

Source: Popularity:5245 Publication time:2017-11-23 11:07:57 smallmiddlebig

Believe that the central feed system manufacturers know that the central feed system has the ability to change the variety of raw materials, multi-color materials used in combination, to achieve the coloring process automation features, while the central feeding system can be fully automatic Recycling and using the nozzle cold material, it can control all of the feeding equipment and prevent the occurrence of blockage in the storage silo, by setting the central monitoring station to achieve full automation, the central feeding system due to accurate measurement, mixing, And the flexibility to change the color, to adapt to the product multi-color variety requirements, it is widely used in many injection molding workshop.


中央供料系統

Central feeding system process configuration features:


1, the middle of the material handling system:

the rapid growth of science and technology to the plastic raw materials processing industry has created a broader space for growth, however, as the scope of business continues to expand, the competition is also facing endless relief. How to improve the quality of products, improve production efficiency and reduce various types of consumption is an important decisive point of business growth, in order to meet the demand, Hengrong machinery and equipment research and manufacture of intermediate materials processing plastics, plastic raw materials in the drying, transportation and Storage and other aspects of supply solutions. The design concept is compact, reliable operation, simple maintenance, energy conservation.

2, the central transport system:

the central transport system to accept the vacuum transport method, through the convergence of the piping system to transport plastic materials from the storage tank to the central drying system, and then the dried material transported to each injection molding machine, the system first By the vacuum pump, the middle of the dust filter, suction box, the middle of the sub-stations, transport lines and other components. Intermediate transport system to accept the "one dull one pipe" planning methods to ensure that the entire system is stable, no blocking phenomenon. It cooperates with the center drying system. Drying atmosphere can be used to transport the material to prevent moisture after the resurgence of the material, at the same time in each transport cycle after the transfer line will be liquidated to ensure that there is no residual pipeline particles, to prevent the resurgence of materials also help Improve the quality of molded products.

3, the center of the drying system:

the middle of the drying system adopts the latest Feng Chao dehumidifying dryer, which uses the material for the reliable dry supply of continuous chaos low dew point drying wind, drying management system and many other skills as well as the latest PLC microcomputer Digital controller, PID temperature control system. Closed loop not only saves energy, but also closes the circuit at high temperatures during the regeneration process to ensure that the plastic is transported dry. 1.2 cooler with the characteristics of agile cooling to improve moisture absorption effect wheel dehumidifier, and make the energy to obtain the maximum level of exercise, the internal structure of stainless steel one piece, the tube also has a small loss, the advantages of heating average. Dehumidifier can be washed, long service life. For some materials, drying at high temperature will cause thermal degradation of materials, the use of human intelligent drying management system is through the monitoring of the amount of material used to actively adjust the drying temperature, the lower the amount of material in the context of active low Drying temperature to prevent damage to the material in the process not only save a little heat, but also to ensure the continuity of production, if the material used in the environment to increase rapidly, the system will alarm, warned the material did not get useful drying, Easy to operate.

The above is the configuration of the central feed system process features, in addition, the central feed system uses vacuum transfer mode, through the central pipeline system to transfer plastic raw materials from the storage tank to the central dehumidification drying system, and then the dried feedstock to In each injection molding machine. Ensure that the entire system of air transport of raw materials to prevent moisture desiccant after the resurgence of raw materials, while stable in each transport line.

Relevant information
主站蜘蛛池模板: 内江市| 甘孜| 枣阳市| 德江县| 耿马| 沅江市| 武邑县| 康乐县| 新余市| 德保县| 重庆市| 清远市| 枝江市| 全南县| 建始县| 淳化县| 绥宁县| 布拖县| 双鸭山市| 洪洞县| 正蓝旗| 旬阳县| 开平市| 霸州市| 盐源县| 亳州市| 额济纳旗| 荥阳市| 库尔勒市| 蒲城县| 蓝山县| 绥宁县| 乌拉特后旗| 牙克石市| 威远县| 漳州市| 新民市| 黄山市| 定兴县| 玉树县| 瑞昌市|